SHAPE LINES

CUSTOM POOLS AT ANY DESIGN YOU WISH

Construction of swimming pool panels in any design and shape. Speed of construction, Economy and multi-year guarantee are an ideal choice for the construction of a swimming pool in existing properties (no revision of the building permit is required).

Metal Panel

The metal panel under the trade name S280 GD + ZM310 Steel produced in the European Union according to EN 10346 is suitable for the construction of public and private swimming pools. The panel has a thickness of 2mm and is coated with aluminium, zinc, magnesium by the method of continuous hot dipping. This composition gives the construction increased resistance against ammonium chloride and at the same time a lower coefficient of friction compared to the common galvanized panel.

Liner Panels

The Liner 1,5mm thick made of 2 PVC films reinforced with polyester mesh. Ideal for public swimming pools with high load. Ensures optimal fit even in the most demanding structures.

Construction Licences

Custom pools are built with a small-scale permit (no building permit or IKA required).

FREQUENT QUESTIONS

SHAPE LINES

Speed ​​of construction, economy and a multi-year warranty make the custom pool an ideal choice for existing properties (no building permit review required).

  1. Its surface should not exceed 50 m2
  2. A reinforced concrete wall is not required for their installation
  3. It should be serviced with external compact engine room systems.
  • The shaping of the surrounding area should be done with special care and special materials, as pressure should not be exerted on the forming panels of the pool walls.
  • Its floor should be formed with strong concrete (which will allow for the safe anchoring of the supports of the pool wall panels) and not with a lightweight concrete.
  • The pool cannot be left empty for a long time without special care and protection.

The pool is built with a small-scale permit (no building permit, nor IKA required).

At Funpools we have partners all over Greece, Athens, Crete, Ionian Islands and Cyprus.

  • 2X6: 16.800 € + VAT
  • 3X6: 17.400 € + VAT
  • 3X7: 18.100 € + VAT
  • 3X8: 18.700 € + VAT
  • 3X9: 19.300 € + VAT
  • 4X7: 20.500 € + VAT
  • 4X8: 21.100 € + VAT
  • 4X9: 21.700 € + VAT
  • 5X7: 21.200 € + VAT
  • 6X8: 22.200 € + VAT
  • 5X10: 22.800 € + VAT
  • The metal panels.
  • Compact engine room: Kripsol filter, 230v Kripsol pump, electrical panel with transformer for the lights.
  • Glass for the filter.
  • Liner 10/165mm, 25m monochrome.
  • Liner installation accessories: channel, wedge, tape.
  • White liner accessories: Skimmer, water inlets, cleaning nozzle, level regulator, bottom well, cleaning set (hand broom).
  • LED lights and connection/installation accessories.
  • The price does not include:
  • Excavation and reinforced concrete of the base.
  • The accommodation of the workshop (3 people).
  • The configuration of the surrounding space and the optional placement of lip.

1. THE PROCESS

The necessary excavation for the pool and for the additional space required for the placement of the wall supports is carried out. Also the excavation at the location of the Compact Engine Room (one of the commitments of the small scale permit).After the excavation, the metal reinforcement is placed and the bottom well is installed. An indicative photograph of this stage is provided below.

Swimming Pool Design - Construction, Fupools Chania

2. LOCATION

The cement is placed after the necessary time for its curing, the necessary galvanized panels and their assembly components are transported to the site that has been formed.
An indicative photo of this stage is given below.

Swimming Pool Construction and Design

3. MOUNTING

The pool is mounted with special screws and then fixed with the help of special braces. An indicative photo of this stage is given below.

Prefab and Custom pools in Greece and Cyprus, Funpools

4. PARTS

The built-in fittings and hydraulics necessary for the circulation of water and the transfer from the pool to the filtration complex and the return of the clean water to the pool are installed.

Custom pools

5. ENGINE STATION

The Compact engine room is installed and connected to the pool and the lighting fixtures. At this stage the connection to the electrical supply is also made, which is provided by the owner, with an electrical line that serves only the pool. At the same time, the connection of the pool drainage line (necessary for the rinsing of the filter) is made, which is also provided in the engine room by the owner.

Pool accessories

6. FINAL STAGE

The space is blocked up and the surrounding floor is shaped. After the area is cleaned, the liner is placed, the pool is filled with water and put into operation. For this reason it is easier to construct as the inner liner ensures the waterproofness of the pool, but also shapes the inner surface (two basic phases in one). A basic condition also for enjoying a Prefab pool without problems during the years of use, is in this case, the diligent care and protection of the liner more than in traditional pools both during the use of the pool and during the winter. For this reason, either a protective cover is normally required, or the pool is left in operation all year round and consistent cleaning care is required.

Custom Swimming Pool

By knowing these secrets of a Prefab pool, you will surely be able to enjoy it for many years, without problems and unnecessary costs, so it will be a wise choice. By knowing these secrets of a Prefab pool, you will certainly be able to enjoy it for many years, without problems and unnecessary costs, to make it a wise choice.